Final | 10/26/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Pressure Test | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | CANC |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 8/18/2017 | 8/18/2017 | 8/18/2017 | A | FAIL |
Alan Hauser
|
|
|
builder has to frame around b-vent on 2nd floor room so clearances can be checked
|
Rough-in | 8/14/2017 | 8/15/2017 | 8/15/2017 | P | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- furnace does not match manual J by model #- supply boot missing by fireplace- fresh air needs to be 8" round not 6" round to R/A plenum- b vent framing needs completed 2nd floor closet and roof jack needs installed b vent laying against plywood and needs supported- range hood vent ???- dryer vent needs supported every 4 feet- left correction notice front window- fireplace R/I ok
|
Pressure Test | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
Rough-in | 8/13/2017 | 8/14/2017 | 8/14/2017 | P | NR |
Alan Hauser
|
|
|
|
Issue PAID IN FULL permit | | | 8/13/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/13/2017 | | DONE |
|
|
|
This permit was created on the web by Oleg Chervak
|