Final | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PART |
Brian Scoles
|
|
|
Please call ahead 30min for access - Mike Phone #: ###-####- Final ok- Need pemit for range hood and gas piping install pulled by contractors that ran it before this permit can be finaled out- need gas pressure test also
|
Final | 1/29/2018 | 1/30/2018 | 1/30/2018 | A | FAIL |
Brian Scoles
|
|
|
mike Phone #: ###-####- need to insulate RA in garage- need secondary drains ran out on both units- need uv protection on linsets outs both units- cant final,out permit til other mechanical issues are resolved with builder- need to add 1 AC and 1 furnace to permit
|
(F) Reprint permit | | | 1/30/2018 | | DONE |
|
|
|
|
Rough-in | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | PASS |
Chad Schwendiman
|
|
|
Mike Phone #: ###-####
|
Application received | | | 9/20/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/20/2017 | | DONE |
|
|
|
|