Final | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | PASS |
Chad Schwendiman
|
|
|
Inspection requested via web by David Petsche
|
Rough-in | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Brian Scoles
|
|
|
primary drain will be ran on final- log set at final- no manual J needed per conversation with Dave he talked to Troy- breaker for A/C needs to be right size and weather tite whip- R/I ok
|
Pressure Test | 10/19/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Brian Scoles
|
|
|
5lb flue test pass to furnace
|
Rough-in | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by David Petsche- need to submit for manual J- need weather tite whip to A/C- log set will install on final due to construction going on-
|
Issue PAID IN FULL permit | | | 10/18/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/18/2017 | | DONE |
|
|
|
This permit was created on the web by David Petsche
|