Final | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Eric Strole
|
|
|
Inspection requested via web by Konrad Swartz
|
Conference | 2/6/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Eric Strole
|
|
|
This is for a duct blast witness at 2:30pm Inspection requested via web by Konrad Swartz-Duct blast pass.
|
Rough-in | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- corrections made
|
Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- armor flex in wall to outside at A/C upstairs still has bare copper showing in wall- need to fix all rips and tears- need R/A finished in crawl downstairs to duct in joists- 6" fresh air to R/A plenum in garage needs vapor barrier removed from grill outside- left correction notice front window
|
Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- need approved manual J onsite for inspection- all bare copper on line set needs rips and tears fixed on lineset from furnace to outside- flexible duct needs to be installed per manufacture installation manul missing mechanical fasteners on ALL flex connections
|
Pressure Test | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- 20lb gas pass
|
Issue PAID IN FULL permit | | | 11/13/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/13/2017 | | DONE |
|
|
|
This permit was created on the web by Konrad Swartz
|