Final | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I ok
|
Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | CANC |
Brian Scoles
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- see other R/I inspection
|
Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | FAIL |
Brian Scoles
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- need approved manual J onsite for inspection
|
Pressure Test | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Brian Scoles
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20 lb gas pass- 5lb flue pass X 2
|
Pressure Test | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass- flues not under pressure
|
Rough-in | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | FAIL |
Brian Scoles
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- insulation shield on b vent 2nd floor- combustion air basement-exhaust fan hooked up main level- manual J needs updated and resubbmitted to city on ducting and equipment-insulate all bare metal-dryer vent 2nd floor needs fixed smashed-flue test- upstair furnace closet needs combustion air and pan installed underneath-conditioned crawl fan and duct needs installed- fresh air to R/A plenum basement furnace- left correction notice with installer
|
Issue PAID IN FULL permit | | | 12/6/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/6/2017 | | DONE |
|
|
|
This permit was created on the web by Oleg Chervak
|