Final | 10/1/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt
|
Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- range hood ducting ok- other corrections still need made
|
Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- - range vent cant be flex needs to be smooth ducting- lineset penetration needs sealed- A/C breaker size needs to be a 15amp- couldnt find duct blast sticker
|
Rough-in | 12/14/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt
|
Rough-in | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt-Need 1" clearance around single wall vent. Insulation sheild needs 1" clearance around single wall vent. Need transfer grills in bedrooms. Fresh air needs to come off retutn air plenum. Per manual-j supply register needs to be in bath not walk-in closet.
|
Pressure Test | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt-20 lb gas test pass
|
Telephone call | | | 12/8/2017 | | DONE |
|
|
|
Spoke with Joseph and got the fixture count insted of the sqft since the home is not brand new
|
Issue PAID IN FULL permit | | | 12/7/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/7/2017 | | DONE |
|
|
|
This permit was created on the web by Joseph Profitt
|