Final | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PASS |
Chad Schwendiman
|
|
|
|
Pressure Test | 3/19/2018 | 3/20/2018 | 3/20/2018 | A | PASS |
Chad Schwendiman
|
|
|
Will Phone #: ###-#### - 20lb gas pass for underground piping to fire pit
|
CHANGE STATUS TO (ISS) | | | 3/19/2018 | | DONE |
|
|
|
reopen permit per Eric Strole. Still need p/t for gas line to fire pit.
|
Final | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Chad Schwendiman
|
|
|
Will Phone #: ###-####
|
Rough-in | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Chad Schwendiman
|
|
|
Will Phone #: ###-####
|
Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Will Phone #: ###-#### - Insulation shield needs 1" spacing between it and the b-vent and it needs to extend above the insulation level. Need to complete the crawl, duct in crawl needs to be supported a minimum of 4" above the ground
|
Rough-in | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | NR |
Chad Schwendiman
|
|
|
Will Phone #: ###-####
|
Pressure Test | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Chad Schwendiman
|
|
|
will Phone #: ###-#### - 20lb gas pass
|
Rough-in | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | NR |
Chad Schwendiman
|
|
|
will Phone #: ###-#### - Not ready. Rough in is not complete
|
Application received | | | 1/3/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/3/2018 | | DONE |
|
|
|
|