Final | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Brian Scoles
|
|
|
Need a Mechanical Final inspection for today. Please contact Neal at ###-#### before you go to the project so that he can open up the residence thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- final ok
|
Final | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | FAIL |
Brian Scoles
|
|
|
Final Needed for A.M. Must call Neal Lindermood to let you into the property at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- dryer vent needs hard piped through wall- needs secoundary drained piped to drain or switched -needs duct blast completed- needs air balance report on site- needs approved Man J on site- left correction notice on counter with owner
|
Final | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | FAIL |
Brian Scoles
|
|
|
Final Inspection needed if you have any questions or concerns please call Karl at ###-#### thank you:) Phone #: ###-#### Inspection requested via web by Karl Hestekin- house locked up- no access
|
Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Brian Scoles
|
|
|
Mechanical Cover Inspection Needed PM today for Sanders Residence.If you have any questions please call Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- R/I ok
|
Pressure Test | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Brian Scoles
|
|
|
Mechanical Gas Pressure Test Inspection Needed PM today for Sanders Residence.If you have any questions please call Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 20lb gas pass
|
Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PART |
Brian Scoles
|
|
|
Inspection requested via web by Karl Hestekin- need to figure out whos responsible for gas piping to home- pressure is above 20lb on gauge- need to install master bath fan per homeowner- range hood duct ?- need crawl completed too- Karl checking into these issues
|
Issue PAID IN FULL permit | | | 1/8/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/8/2018 | | DONE |
|
|
|
This permit was created on the web by Karl Hestekin
|
Telephone call | | | 1/8/2018 | | DONE |
|
|
|
Left a message for Karl informing him that this permit will have to be pulled by sqft since it is a brand new ADU. informed him of the additional fee that would need to be paid
|