Final | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Bill VanDegrift
|
|
|
Please call phone number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch
|
Pressure Test | 1/15/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Brian Scoles
|
|
|
Pressure test is needed for the gas line. There also needs to be a pressure test for the furnace vent (pvc pipe). A gas line was run to the furnace, range, and dryer. Phone #: ###-#### Inspection requested via web by Steve Bunch- 2olb gas pass- 5lb flue pass
|
Issue PAID IN FULL permit | | | 1/15/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/15/2018 | | DONE |
|
|
|
This permit was created on the web by Steve Bunch
|