Final | 12/7/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Troy James
|
|
|
|
Final | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Troy James
|
|
|
Need to label fire dampers at damper locations.
|
Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Troy James
|
|
|
ceiling cover ok to cover drop ceiling
|
Rough-in | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | NR |
Troy James
|
|
|
|
Rough-in | 7/11/2018 | 7/11/2018 | 7/12/2018 | P | PASS |
Troy James
|
|
|
|
Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Troy James
|
|
|
routine inspection of the dry and wet side
|
Rough-in | 5/1/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Troy James
|
|
|
inspection of hydronic and dry side duct system
|
Rough-in | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | NR |
Troy James
|
|
|
fire damper framing rough in
|
Rough-in | 3/30/2018 | 4/2/2018 | 4/2/2018 | P | FAIL |
Troy James
|
|
|
Need 20 gage metal for angles, gap at damper to opening okay
|
Rough-in | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Troy James
|
|
|
ok dampers at electrical room and framing northeast corner room
|
Rough-in | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | CANC |
Troy James
|
|
|
Fire damper inspection rescheduled for tomorrow
|
Rough-in | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Troy James
|
|
|
ok revised fire damper locations, framing ok at electrical room
|
Rough-in | 2/14/2018 | 2/15/2018 | 2/16/2018 | P | PART |
Troy James
|
|
|
Need revised shop drawing where ducts penetrate the electrical room.
|
Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Troy James
|
|
|
inspection of wet and dry mechanical, inspecting work in progress
|
Issue PAID IN FULL permit | | | 2/6/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 2/5/2018 | | |
|
|
|
|
Application received | | | 2/5/2018 | | DONE |
|
|
|
This permit was created on the web by Xenon Long
|
First Notice | 12/7/2018 | 12/7/2018 | | | |
Troy James
|
|
|
|