Final | 4/2/2018 | 4/4/2018 | 4/4/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- final ok
|
Final | 4/2/2018 | 4/3/2018 | 4/2/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
Conference | 3/20/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Brian Scoles
|
|
|
W Duct Blast 130 pm Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast test pass
|
Pressure Test | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brian Scoles
|
|
|
Please call Shannon with any issues Phone #: ###-#### Inspection requested via web by Zach Moran- 20lb gas pass
|
Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brian Scoles
|
|
|
Please call Shannon with any issues Phone #: ###-#### Inspection requested via web by Zach Moran- R/I ok
|
Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- need tgo support lineset above kitchen in attic- gas test failed- need to insulate 6' 90 degree bare metal on fresh air at R/A plenum- b vent needs clearance to combustibles 2nd floor behind bath tub, plastic touching pipe- left correction notice front window
|
Pressure Test | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- guage below 20
|
Issue PAID IN FULL permit | | | 2/7/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/7/2018 | | DONE |
|
|
|
This permit was created on the web by Debbie Marino
|