Final | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Sorensen
|
Final | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Sorensen flex tubing is not an approved condensate material
|
Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Ben Livingston
|
|
|
approved copy onsite Phone #: ###-#### Inspection requested via web by Dave Sorensen
|
Rough-in | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | FAIL |
Ben Livingston
|
|
|
rough mec inspection, gas pressure and flue pressure witness. test gauges and manual j located in basement next to furnace. Phone #: ###-#### Inspection requested via web by Dave Sorensen need to submit manual j for approval, and have approved manual j on site for inspection
|
Pressure Test | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Ben Livingston
|
|
|
rough mec inspection, gas pressure and flue pressure witness. test gauges and manual j located in basement next to furnace. Phone #: ###-#### Inspection requested via web by Dave Sorensen 20lb gas, 5lb flue
|
Issue PAID IN FULL permit | | | 2/27/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/27/2018 | | DONE |
|
|
|
This permit was created on the web by Dave Sorensen
|
Telephone call | | | 2/27/2018 | | DONE |
|
|
|
Spoke with Dave. permit was pulled by sqft insted of fixtures
|