Final | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | PASS |
Brian Scoles
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final on HVAC and fireplace ok
|
Rough-in | 3/14/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Brian Scoles
|
|
|
R/I ok- fireplace R/I ok
|
Rough-in | 3/14/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Brian Scoles
|
|
|
fireplace R/I ok
|
Conference | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | DONE |
Brian Scoles
|
|
|
8:00 - 8:30 - RJ Phone #: ###-#### Inspection requested via web by Brandon Sorensen- went over issues with installer- talked about fireplace install b vent insulation shield nail plates and other misc stuff
|
Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 | P | FAIL |
Brian Scoles
|
|
|
Rough-in - Call David Phone #: ###-#### Inspection requested via web by Brandon Sorensen- corrections not made- conference tomorrow AM
|
Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Brian Scoles
|
|
|
Rough in Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need approved ACCA report onsite- fireplace firestop needs plastic reattached and sealed up so can not come into contact with fireplace- b vent 2nd floor needs framed out and firestop put in at ceiling with insulation shield to fire stop- crawl needs completed- 6" fresh can not come from return air can needs to tie in before register- need to fix rips and tears on armaflex in crawl- b vent insulation shield in garage needs 1" clearance and secured- left correction notice front window
|
Pressure Test | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Brian Scoles
|
|
|
Pressure witness Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 20lb gas pass
|
Issue PAID IN FULL permit | | | 3/5/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/5/2018 | | DONE |
|
|
|
This permit was created on the web by Brandon Sorensen
|