Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Bill VanDegrift
|
|
|
|
Rough-in | 3/19/2018 | 3/19/2018 | 3/20/2018 | P | PASS |
Bill VanDegrift
|
|
|
fp ri ok
|
Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | A | PART |
Brian Scoles
|
|
|
fireplace R/I ok- need all permits attached to right address to pass inspection- builder will get with city
|
Rough-in | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Ashley Stegemann- plastic at floor is touching the fireplace- plastic needs secured better-
|
Issue PAID IN FULL permit | | | 3/15/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/15/2018 | | DONE |
|
|
|
This permit was created on the web by Ashley Stegemann
|