First Notice | 7/5/2018 | 7/5/2018 | 8/24/2018 | | DONE |
Brian Scoles
|
|
|
This permit finaled on the web by Dave Sorensen
|
Final | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Brian Scoles
|
|
|
pls call so can meet at job site Phone #: ###-#### Inspection requested via web by Dave Sorensen- final ok
|
Final | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | NR |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Sorensen
|
Conference | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Jack Reynolds
|
|
|
T bar Grid inspection - for cover Phone #: ###-#### Inspection requested via web by Dave Sorensen- ceiling tile ok for cover
|
Rough-in | 4/30/2018 | 5/2/2018 | 5/2/2018 | P | PART |
Jack Reynolds
|
|
|
pls call so we can meet at the jobsite. Phone #: ###-#### Inspection requested via web by Dave Sorensen- checked rest of hardlids ok to cover- checked gas line was raised up off roof 3.5 inches- talked to dave about back draft damper on dryer exhaust- still need to finish duct work on roof for the rest of the rough in inspection
|
Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PART |
Brian Scoles
|
|
|
meet at 115 pm with Dave-2083918945- part R/I inspection on hard lids- ok to cover hard lids only
|
Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | A | CANC |
Brian Scoles
|
|
|
please call me so can meet to walk job Phone #: ###-#### Inspection rescheduled for afternoon per phone call with Dave
|
Pressure Test | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Brian Scoles
|
|
|
please call ahead so can meet you to walk the job with you Phone #: ###-#### Inspection requested via web by Dave Sorensen- 60LB gas pass across roof from west to east- all gas piping needs to be minimum of 3.5 inches off roof membrane
|
Issue PAID IN FULL permit | | | 4/12/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/12/2018 | | DONE |
|
|
|
This permit was created on the web by Dave Sorensen
|