Final | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- single wall flue needs 6" clearance to combustibles(arma flex)
|
Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- primary/secondary drains needs 6" clearance to flue- primary drain outside needs stubbed down below wood siding
|
Pressure Test | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
Rough-in | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requestok r/i
|
Issue PAID IN FULL permit | | | 4/13/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/13/2018 | | DONE |
|
|
|
This permit was created on the web by Devony Bullard
|