Final | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Chad Schwendiman
|
|
|
blast test and balancing report have been completed I told builder that for gas ranges hood/microwave has to be 30" minimum as per code unless appliance says in writing it may be less space in between. he said he talked to building inspector and said its ok to be less than 30" that we all interpret that code wrong. builder said if we fail inspection he will change gas range for electric but i guess he does not believe me or the mechanical code.
thanks! Phone #: ###-#### Inspection requested via web by Manuel Canto
|
Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Chad Schwendiman
|
|
|
Call Manny 20 min ahead Phone #: ###-#### Inspection requested via web by Manuel Canto
|
Pressure Test | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Chad Schwendiman
|
|
|
Call Manny 20 min ahead Phone #: ###-#### Inspection requested via web by Manuel Canto - 20lb gas pass
|
Issue PAID IN FULL permit | | | 4/19/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/19/2018 | | DONE |
|
|
|
This permit was created on the web by Manuel Canto
|
Telephone call | | | 4/19/2018 | | DONE |
|
|
|
Left a message for Manny informing him that we need his fixure count since it is an addition and not a brand new build
|
Hold | | | 4/19/2018 | | DONE |
|
|
|
Need fixture count. what is in there now is my guess based off his description blh
|
CHANGE STATUS TO (ISS) | | | 4/19/2018 | | DONE |
|
|
|
|