Final | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brian Scoles
|
|
|
a/c coil co gas piping test ok
|
Pressure Test | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brian Scoles
|
|
|
20lb gas pass whole system
|
Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | FAIL |
Brian Scoles
|
|
|
Please call when on way so she can meet you. Phone #: ###-#### Inspection requested via web by Justin Osterhout- need to remove flexable copper condensate and run in pvc on primary drain from coil
|
Issue PAID IN FULL permit | | | 5/31/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/31/2018 | | DONE |
|
|
|
This permit was created on the web by Ron Arnold
|