Final | 6/29/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Brian Scoles
|
|
|
|
Final | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PART |
Brian Scoles
|
|
|
Chuck ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- will final out permit once fireplace is installed and have a rough in inspection done from another contractor
|
Pressure Test | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Brian Scoles
|
|
|
Chuck ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- 20lb gas pass from furnace to fireplace location
|
Issue PAID IN FULL permit | | | 6/5/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/5/2018 | | DONE |
|
|
|
This permit was created on the web by Krista Boss
|