Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Brian Scoles
|
|
|
please call mike with questions ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- Final ok unit heater and gas piping/test on existing system
|
Pressure Test | 6/7/2018 | 6/8/2018 | 6/7/2018 | A | CANC |
Brian Scoles
|
|
|
call mike at ###-#### for questions. thank you! Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Pressure Test | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pass- need drip leg between shutoff valve and appliance- need 1" or more clearance to b vent at roof from insulation or install insulation shield by final
|
Issue PAID IN FULL permit | | | 6/6/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 6/6/2018 | | |
|
|
|
|
Application received | | | 6/6/2018 | | DONE |
|
|
|
This permit was created on the web by Aaron Alandt
|
First Notice | 6/8/2018 | 6/8/2018 | | | |
Brian Scoles
|
|
|
|