Final | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
Rough-in | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Brian Scoles
|
|
|
corrections have been made Phone #: ###-#### Inspection requested via web by Benny Arreola- R/I ok
|
Rough-in | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | FAIL |
Brian Scoles
|
|
|
Rough-In and Pressure Test Please Phone #: ###-#### Inspection requested via web by Benny Arreola- need firestop on b vent in attic( discussed with installer last time was there) and 1" clearance to combustibles
|
Pressure Test | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Benny Arreola- 20lb gas pass
|
Issue PAID IN FULL permit | | | 6/6/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/6/2018 | | DONE |
|
|
|
This permit was created on the web by Benny Arreola
|