First Notice | 6/28/2018 | 6/28/2018 | 7/27/2020 | | DONE |
Troy James
|
|
|
This permit finaled on the web by RM Mechanical
|
Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Final | 6/26/2018 | 6/27/2018 | 6/27/2018 | P | FAIL |
Troy James
|
|
|
Contact: John Please call 30min prior to inspection so the contact can meet with inspector onsite. Phone #: ###-#### Inspection requested via web by RM Mechanical Angles at bottom of duct are required to be sttached to duct. See manufacturer installation instructions for attachment. Need to remove sheetrock from ceiling for inspection
|
Final | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Troy James
|
|
|
Contact: John Please call 30min prior to inspection so the contact can meet with inspector onsite. Phone #: ###-#### Inspection requested via web by RM Mechanical Quick response sprinkler heads to be installed in existing corridor to derate the corridor assembly. Existing CMU wall separating the clinic and corridor is now a fire barrier. Angles at fire damper are required to be all around the damper at corridor side. Ok to remove rated sheetrock ceiling to install the damper per manufacturer installation instructions.
|
Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | NR |
Chad Schwendiman
|
|
|
Contact: Bob Snow Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Issue PAID IN FULL permit | | | 6/21/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/21/2018 | | DONE |
|
|
|
This permit was created on the web by RM Mechanical
|