Final | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Sam Brown- final ok
|
Final | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- flue needs to be installed per manufactures install instruction
|
Rough-in | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Brian Scoles
|
|
|
Made the corections Phone #: ###-#### Inspection requested via web by Benny Arreola- r/i ok
|
Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- need csst approved nail plates from manufacture- supply duct in master bedroom wall serving downstairs need to be ran outside of stud bay for wall insulation value- left correction notice front window
|
Pressure Test | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- 20lb gas pass
|
Issue PAID IN FULL permit | | | 6/22/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/22/2018 | | DONE |
|
|
|
This permit was created on the web by Benny Arreola
|