Final | 3/6/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Jack Reynolds
|
|
|
Edwin Phone #: ###-#### - final ok
|
Final | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | FAIL |
Jack Reynolds
|
|
|
Edwin Phone #: ###-####- Need secondary drain piped or a wet switch in place- lineset penetration needs sealed both outdoor and indoor- lineset insulation needs UV protection outdoors and needs to be completely taped of rips indoors
|
Application received | | | 6/25/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2018 | | DONE |
|
|
|
|
First Notice | 3/8/2019 | 3/8/2019 | | | |
Jack Reynolds
|
|
|
|