Final | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss- water heater flue still needs 3 screw where b vent ties onto single wall pipe- need to support primary condesate drain off coil for protection to damage-
|
Final | 8/28/2018 | 8/29/2018 | 8/29/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss- furnace condensate drain needs pumpoed to washer box or to approved location- primary drain in coil needs ran to approved location- condenser pad needs to be flush with outside of condenser(over hangs) or bigger pad for protection to equipment- water flue needs 3 screws in flue joints- left correction notice on furnace door
|
Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Krista Boss
|
Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Chad Schwendiman
|
|
|
|
Pressure Test | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss - 20lb gas pass 5lb flue pass
|
Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss - Need a copy of the approved manual J onsite.
|
Pressure Test | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss - gas pressure fail, flue pressure fail
|
Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss - 1) Need approved manual J onsite 2) Need insulation shield on B-vent in attic 3) Need 1" clearance to combustables from B-vent. ( wires in attic) 4) Exhaust fans vents not connected
|
Issue PAID IN FULL permit | | | 6/26/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/26/2018 | | DONE |
|
|
|
This permit was created on the web by Krista Boss
|