Final | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles- final ok- card signed
|
Final | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | PART |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Maira Napoles- need side panels installed on class 1 hood or cooking equipment needs 6" clearance on all side of hood- sent Pat images via text on this- rest is good
|
Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####.0 Phone #: ###-#### Inspection requested via web by Maira Napoles- roof gas line all good- need equipment set under class 1 hood and gas piping installed- rest is good- will look at this on other mech inspection at final
|
Mec-Aging Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | FAIL |
Brian Scoles
|
|
|
needs called in for cover inspection
|
Rough-in | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | CANC |
Brian Scoles
|
|
|
Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- scheduled for a pressure test on gas line
|
Pressure Test | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brian Scoles
|
|
|
Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- 60lb gas pass from meter to roof and to RTUs and MAU on roof
|
Mec-Aging Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | | CANC |
Brian Scoles
|
|
|
WIP-
|
Issue PAID IN FULL permit | | | 7/5/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/5/2018 | | DONE |
|
|
|
This permit was created on the web by Maira Napoles
|
First Notice | 9/19/2019 | 9/19/2019 | | | |
Brian Scoles
|
|
|
|