Final | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans
|
Pressure Test | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard - 20lb gas
|
Rough-in | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard
|
Rough-in | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- need linset ran- need tpo seal supply duct 1st floor bedroom and install flex per manufactures install- remove transfer in 2nd floor bathroom- need to redo flex on fresh air kinked needs to flow smoothly- 2- 6" round supply ducts above 2nd floor bathroom kinked needs to flow smoothly- left correction notice front window
|
Pressure Test | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- csst gas piping not installed per manufactures install csst cant be showing in garage south wall- fix and retest gas
|
Rough-in | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Pressure Test | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Issue PAID IN FULL permit | | | 7/12/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/12/2018 | | DONE |
|
|
|
This permit was created on the web by Devony Bullard
|