Final | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Brian Scoles
|
|
|
furnace a/c coil co ok
|
Rough-in | 8/19/2018 | 8/20/2018 | 8/20/2018 | A | CANC |
Brian Scoles
|
|
|
As per the previous inspection, all the rubber flexible couplings were replaced with more appropriate PVC unions; a cleanout Tee was added right downstream to the outlet of the furnace exhaust. The vent piping was pressurized at 5 psig for more than 48h without any change in the gauge. The threaded test plug in the cleanout Tee and the pressure gauge, along with the air compressor will be available for a live test. As in previous occasions, call Tona at ###-#### or Nicole at ###-#### about 25 minutes before to drive to the condo.
Thanks! Phone #: ###-#### Inspection requested via web by Nicole Yogerst
|
Rough-in | 8/12/2018 | 8/13/2018 | 8/13/2018 | P | FAIL |
Brian Scoles
|
|
|
As discussed in the previous rough-in inspection, I have completed the installation of the furnace, evaporator coil and condensing unit. Please call Tona at ###-#### or myself at ###-####, 25 minutes before arriving. Phone #: ###-#### Inspection requested via web by Nicole Yogerst- need to pressure test flue- rest is good- recall in inspection when ready
|
Rough-in | 7/19/2018 | 7/19/2018 | 7/20/2018 | P | DONE |
Brian Scoles
|
|
|
Please meet plumbing inspector at residence at 1:30PM on 07/19/2018. Thank you! Phone #: ###-#### Inspection requested via web by Nicole Yogerst- went over furnace a/c install- will need a flue test 5 psi on 15 psi gauge max
|
Issue PAID IN FULL permit | | | 7/19/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/19/2018 | | DONE |
|
|
|
This permit was created on the web by Nicole Yogerst
|