Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberMEC18-03675
StatusFinaled
Name BUNCH SHEET METAL
Site Address 3152 S FALLING BROOK LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: New furnace and a.c. system. Furnace relocated to the crawl space. Duct adapted to accommodate this change.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/16/20194/16/20194/16/2019PPASS
DetailsJack Reynolds
Please call the number provided when on the way out. Phone #: ###-#### Inspection requested via web by Steve Bunch
- final ok
Mec-Aging Inspection4/9/20194/9/20194/9/2019 DONE
DetailsJack Reynolds
WIP
Rough-in8/22/20188/23/20188/23/2018APASS
DetailsJack Reynolds
call for access code // Steve Phone #: ###-####
- drip leg ok- crawl access/light and furnace disconnect ok- b vent clearances ok- fresh air ok- duct blast ok- R/I and cover ok
Rough-in8/10/20188/14/20188/14/2018PFAIL
DetailsJack Reynolds
Steve-call for access code Phone #: ###-####- need a drip leg in gas line at furnace- B vent coming through floor needs 1" clearances- furnace needs service discconect and light in crawl- access opening into crawl is too small needs to be 22x 30 - make sure that toe kicks in two locations are ducted all the way to the register- need to see 6" fresh air intake
Rough-in7/31/20187/31/20187/31/2018PFAIL
DetailsJack Reynolds
- B vent for furnace needs 1" clearances in the crawl space, main floor in the closet where in goes into the wall, and i need to see an insulation sheild in the attic
-Main supply trunk in the crawl is laying on the ground and has the B vent laying on it- supply branches need dampers for air balancing and supply boots sealed
- need service dissconnect for the furnace in the crawl space and a light - need to know where the crawl access is going to be and how big it is going to be for removal of equipment if needed
- Line set insulation needs fixed and UV tape- penetration out the foundation needs to be sealed and the breaker size is too large- power whip to A/C needs to be weather tight
- range hood vent is not tied into termination properly
- need to see that the permit has exhaust fans, range hood,and duct work added and fees paid
- Man J. needs to be performed and approved by the city of boise
Rough-in7/30/20187/31/20187/31/2018PFAIL
DetailsJack Reynolds
vacant, call for access code - Steve Phone #: ###-####- no access called steve and left message
Rough-in7/27/20187/30/20187/30/2018ACANC
DetailsJack Reynolds
Shaun or Steve ###-#### Phone #: ###-####5
Rough-in7/27/20187/27/20187/27/2018PNH
DetailsJack Reynolds
Call for access // Sean Phone #: ###-####
- no access to home called number no answer and voice mail was full
Issue PAID IN FULL permit  7/27/2018 DONE
Payment received via Govolutions
Application received  7/27/2018 DONE
This permit was created on the web by Steve Bunch