Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Jack Reynolds
|
|
|
Please call me a little bit before you will be heading that way so I can meet you there in case the owner is not there.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha - final ok
|
Mec-Aging Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Mec-Aging Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | DONE |
Jack Reynolds
|
|
|
WIP
|
Mec-Aging Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | | DONE |
Jack Reynolds
|
|
|
WIP
|
Rough-in | 9/26/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jack Reynolds
|
|
|
R/I ok
|
Pressure Test | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jack Reynolds
|
|
|
Gas pressure test. Couple misc items. Please call before son I can meet on site to get you into the house.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha -20lb pressure test ok- 5lb flue pressure test ok
|
Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | FAIL |
Jack Reynolds
|
|
|
Can you call me to make sure I am here amd can we also scheduale it for mid morning please.
This is for the remainimg rough-in inspection and a gas pressure test. Troy should have the approval on the Manual J in the morning. The flue test has already been done and the walk through on the house.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha need b vent clearances- need a double valve open ended tee in gas line for pressure test or discconect gas line from meter
|
Rough-in | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PART |
Chad Schwendiman
|
|
|
Late in the afternoon as possible today
This is a furnace flue pressure test, and possibly a walk through on the rough in to see if it would be ready for the rough in inspection at the same time. Pressure test on the gas will probably be Monday afternoon.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha - 5lb flue
|
Conference | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | DONE |
Jack Reynolds
|
|
|
Please call soI have enough time to make it over there. Phone #: ###-#### Inspection requested via web by Geff Blecha
|
Issue PAID IN FULL permit | | | 8/9/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/9/2018 | | DONE |
|
|
|
This permit was created on the web by Geff Blecha
|