Mec-Aging Inspection | 10/24/2019 | 10/24/2019 | 10/24/2019 | | PASS |
Jack Reynolds
|
|
|
Doc Permit Expired ok
|
DOC - Permit Expired | 10/24/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Jack Reynolds
|
|
|
Doc Permit Expired ok permit not active
|
Mec-Aging Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | | DONE |
Jack Reynolds
|
|
|
Talked with Travis Baker about his mechanical aging permit. He is going to work on getting in touch with the owner. Permit has not been active since Aug 2018
|
Mec-Aging Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | DONE |
Jack Reynolds
|
|
|
Talked with Travis about their mechanical aging permit. I told Travis there is still some corrections to be made on this site that hasn't been seen by the City of Boise yet. If corrections have been made schedule an inspection with the owner.
|
Pressure Test | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | FAIL |
Jack Reynolds
|
|
|
Pressure gauge is located by the meter in back of the building. This gas system is being converted to a 2psi system. Phone #: ###-#### Inspection requested via web by Travis Baker - 60lb gas pressure test ok- need to support gas line on exterior wall next to meter- venting for coffee roaster needs clearances to combustibles at roof- double wall vent pipe also need to be a cat lll positive vent
|
Issue PAID IN FULL permit | | | 8/29/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 8/29/2018 | | |
|
|
|
|
Application received | | | 8/29/2018 | | DONE |
|
|
|
This permit was created on the web by Travis Baker
|