Final | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brian Scoles
|
|
|
Please call on way: Chet ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Jack Reynolds
|
|
|
need to check clearances on b vent in wall - b vent clearances ok
|
Rough-in | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss- return air ducting ok- range hood duct ok- this afternoobn im going to swing back by to make sure that the builder frames wall with clearances to b vent
|
Pressure Test | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss- 20 lb gas pressure test ok
|
Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | NR |
Jack Reynolds
|
|
|
Please call on way: Tyler ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- need to add other for return ducting- gas line not ready
|
Pressure Test | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | NR |
Jack Reynolds
|
|
|
Please call on way: Tyler ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- not ready
|
Issue PAID IN FULL permit | | | 8/30/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/30/2018 | | DONE |
|
|
|
This permit was created on the web by Krista Boss
|