Mec-Aging Inspection | 5/3/2019 | 5/3/2019 | 5/3/2019 | | DONE |
Brian Scoles
|
|
|
|
Final | 5/3/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Brian Scoles
|
|
|
should have finaled on pressure test inspection
|
Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Brian Scoles
|
|
|
high pressure gas test. Phone #: ###-#### Inspection requested via web by Aaron Alandt- 60lb gas pass existing system- tagged meter- need to verify if CO detectors are installed before final
|
Pressure Test | 9/18/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Brian Scoles
|
|
|
INSTALLER ANAS ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pass underground to fire pit
|
Pressure Test | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | CANC |
Brian Scoles
|
|
|
INSTALLER ANAS ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Issue PAID IN FULL permit | | | 9/18/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/18/2018 | | DONE |
|
|
|
This permit was created on the web by Aaron Alandt
|