Final | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- radiant heater gas piping final ok
|
Final | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- need installation instuction manual for heater- none could be found onsite
|
Pressure Test | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- 60lb gas pass from meter to radiant heater location- will look at regulator at final
|
Issue PAID IN FULL permit | | | 10/31/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/31/2018 | | DONE |
|
|
|
This permit was created on the web by Marisa Hone
|