Final | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jack Reynolds
|
|
|
Ken Phone #: ###-#### - final ok
|
Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PART |
Jack Reynolds
|
|
|
Richard Phone #: ###-#### - all corrections ok - need to see the contractor that is installing the A/C pull a permit
|
Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | FAIL |
Jack Reynolds
|
|
|
Richard Phone #: ###-#### - need two wet switch installed one on the secondary drain and one on the pan under the furnace- - need 1" clearances on furnace b vent and water heater b vent - gas line needs sediment trap after shut off valve - install co detectors near bedrooms
|
Application received | | | 11/19/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2018 | | DONE |
|
|
|
|