Final | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Ben Livingston
|
|
|
Ben Livingston asked to Schedule this with him. He did the pressure test. Phone #: ###-#### Inspection requested via web by Kim Evans
|
Pressure Test | 1/8/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Ben Livingston
|
|
|
If its possible to have you go around 2:00/2:30, our tech will be there at 1:00 to unhook the flue and pressurize it. If you could call Skip when you head that way that would be great. ###-#### Phone #: ###-#### Inspection requested via web by Kim Evans 5lb flue
|
Pressure Test | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | CANC |
Ben Livingston
|
|
|
Our installer will be there to disconnect and get it pressured up at 8:00 he thought if you could meet him there at 10 that would give him enough time. Skip is the installer if you would call him before you head his way that would be great. Thank you so much Phone #: ###-#### >> Inspection requested via web by Kim Evans Inspection cancelled from web by: Kim Evans
|
Final | 1/2/2019 | 1/4/2019 | 1/4/2019 | A | FAIL |
Ben Livingston
|
|
|
if you could call when you head her way that would be great. ###-#### Phone #: ###-#### Inspection requested via web by Kim Evans need to witness flue pressure test
|
Issue PAID IN FULL permit | | | 12/27/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/27/2018 | | DONE |
|
|
|
This permit was created on the web by Kim Evans
|