Final | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Brian Scoles
|
|
|
light switch has been installed in attic with light
|
Final | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | FAIL |
Brian Scoles
|
|
|
Please call homeowner 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- attic access needs electrical light and switch installed
|
Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Brian Scoles
|
|
|
Please call homeowner 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- per phone call with Ryan no air balance report will reschedule when completed
|
Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Brian Scoles
|
|
|
Front door is open, please call Val 30 minutes in advance at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- R/I ok- need 3 screws in b vent to furnace in attic by final- need to seal inside of return 1st floor in furnace closet has big holes by final- need to support R/A duct in attic to roof trusses accross access to furnace location has big sag by final- will look at these issues at final- ok to cover
|
Rough-in | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | FAIL |
Brian Scoles
|
|
|
Front door is open, worker in back yard, please call Val 30 minutes in advance when on way at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- range duct ran backwards- w/h b vent needs insulation shield in attic with fire stop installed with 1" clearance- need to seal end cap in chase second floor and finish tap to wall- need to seal r/a duct end cap 1st floor- all b vent needs 1" clearance to combustibles at roof level- need to add other(supply and R/A duct), dryer exhaust, range hood and 1 bath fan to permit and pay fees by final- correction notice posted inside front door left hand side on nail
|
Rough-in | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | NH |
Ben Livingston
|
|
|
Please call contractor 30 minutes in advance for access at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs no answer
|
Conference | 1/10/2019 | 1/10/2019 | 1/10/2019 | A | NR |
Ben Livingston
|
|
|
11 AM inspection requested please, flue test, please call installer 30 minutes in advance at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs mec walk through
|
Pressure Test | 1/10/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Ben Livingston
|
|
|
11 AM inspection requested please, please call installer 30 minutes in advance at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs 20lb gas 5lb flue
|
Issue PAID IN FULL permit | | | 1/8/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/8/2019 | | DONE |
|
|
|
This permit was created on the web by Lea Briggs
|