Final | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Jack Reynolds
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - final ok - no occ card onsite to sign
|
Card not on site to sign | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Jack Reynolds
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - no card onsite pass
|
Pressure Test | 3/20/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Jack Reynolds
|
|
|
R/I and pressure test on gas piping ok - will need to see tie in on existing gas line and reg set up for 5lb system/ new 10lb system for new warehouse - no review of gas line needed prints show whats being installed
|
Pressure Test | 2/25/2019 | 2/26/2019 | 2/26/2019 | P | FAIL |
Jack Reynolds
|
|
|
RICK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - gas piping installed doesnt match the approved drawings. The approved drawings show a new meter location on the north west side of new buidling. The gas piping that is installed looks like it will be installed on a existing gas line. this needs to be reviewed by the engineer and then approved by the city.
|
Issue PAID IN FULL permit | | | 2/25/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/25/2019 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|
First Notice | 6/26/2019 | 6/26/2019 | | | |
Jack Reynolds
|
|
|
|