First Notice | 7/1/2019 | 7/1/2019 | 7/1/2019 | | DONE |
Jack Reynolds
|
|
|
This permit finaled on the web by Travis Baker
|
Final | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Jack Reynolds
|
|
|
Chilled loop has been insulated and labeled and connected to owner provided chiller. Phone #: ###-#### Inspection requested via web by Travis Baker - final ok - sign occ card
|
Pressure Test | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Jack Reynolds
|
|
|
John with Bakers Plumbing ###-#### any questions call -100lb hydronics test for chiller ok
|
Pressure Test | 5/1/2019 | 5/1/2019 | 5/1/2019 | A | NR |
Jack Reynolds
|
|
|
Chilled loop is under air test, gauge is located in warehouse before it goes outside to the chiller. Phone #: ###-#### Inspection requested via web by Travis Baker
|
Final | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PART |
Brian Scoles
|
|
|
Call if door is locked // Travis Phone #: ###-####- need to secure all new gas piping to new supports on roof- temp occupancy ok-
|
Pressure Test | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Chad Schwendiman
|
|
|
Please call Travis for lock box code if door is locked Phone #: ###-#### Inspection requested via web by Travis Baker - 60lb gas pass
|
Pressure Test | 3/10/2019 | 3/11/2019 | 3/11/2019 | P | FAIL |
Chad Schwendiman
|
|
|
Complete gas line system for this space is under a pressure test. Test gauge is located by the tank less water heater inside of the space. Phone #: ###-#### Inspection requested via web by Travis Baker - Not holding pressure
|
Issue PAID IN FULL permit | | | 3/10/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/10/2019 | | DONE |
|
|
|
This permit was created on the web by Travis Baker
|