Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberMEC19-01212
StatusFinaled
Name RM MECHANICAL
Site Address 333 N 1ST ST Unit: 110
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Wet Mechanical Scope:
-Provide and Install Complete Hydronic Heating Water Piping system with associated valves and controls
-Provide and Install complete Hydronic Chilled Water Piping system with associated valves and controls
-Provide and Install com
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/21/201910/21/20197/27/2020 DONE
DetailsJack Reynolds
This permit finaled on the web by RM Mechanical
Final10/18/201910/21/201910/21/2019PPASS
DetailsJack Reynolds
D18-063 St Luke Final Inspection Mechanical Piping Phone #: ###-#### Inspection requested via web by RM Mechanical
- test and balance ok
- final ok
- signed occ card
Rough-in10/14/201910/14/201910/14/2019PPASS
DetailsBen Livingston
D18-063 HVAC rough-in inspection Phone #: ###-#### Inspection requested via web by RM Mechanical
- area b above grid, minus 2 prociedure rooms -
Rough-in10/8/201910/9/201910/9/2019PPASS
DetailsBen Livingston
The Heating system. Rough-in Josh ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical
- heating system running under working pressure, test and balance for final -
Rough-in9/19/20199/20/20199/20/2019AFAIL
DetailsBen Livingston
HVAC cover inspection - can we get this as early am as possible ?
Phone #: ###-#### Inspection requested via web by RM Mechanical
- all grilles need caddie clips -
Rough-in9/4/20199/5/20199/5/2019ACANC
DetailsBen Livingston
UG Area 2 Phone #: ###-#### Inspection requested via web by RM Mechanical
- ment to call in plm permit-
Rough-in8/14/20198/14/20198/15/2019PPASS
DetailsTroy James
a rough in inspection for steam
Phone #: ###-#### Inspection requested via web by RM Mechanical
Inspected by chad
Rough-in8/13/20198/14/20198/14/2019APASS
DetailsChad Schwendiman
HVAC cover partial Phone #: ###-#### Inspection requested via web by RM Mechanical - Okay to cover d-con room hard lid
Rough-in8/9/20198/9/20198/9/2019PPART
DetailsChad Schwendiman
HVAC rough-in hard lid inspection and rough-in fire damper Phone #: ###-#### Inspection requested via web by RM Mechanical - Fire damper clearances okay. Bathroom hard lids okay to cover.
Rough-in8/7/20198/8/20198/8/2019APART
DetailsChad Schwendiman
HVAC rough-in cover inspection for the operating rooms Phone #: ###-#### Inspection requested via web by RM Mechanical - Fire/smoke damper expansion clearance okay. Need to reinspect once angles are installed
Rough-in8/1/20198/2/20198/2/2019APASS
DetailsTroy James
*** can we get this 1st thing AM friday morning PLEASE!!! ****
Chilled water rough in Phone #: ###-#### Inspection requested via web by RM Mechanical
okay chilled water from pump room to cooling tower and air handler
Rough-in7/23/20197/23/20197/23/2019PPASS
DetailsChad Schwendiman
Partial Heating Water and Chilled Water rough-in area B and chilled water in the Belimed area. at St. Lukes Surgery Phone #: ###-#### Inspection requested via web by RM Mechanical - 100lb hydronics pass
Rough-in7/1/20197/1/20197/1/2019PPASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by RM Mechanical
--restrooms above hard lids ok--
Rough-in6/25/20196/26/20196/26/2019APART
DetailsJack Reynolds
partial inspection on Heat Water System Josh ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical
- area A 100lb hydronics pressure test ok
Rough-in6/21/20196/24/20196/24/2019APART
DetailsChad Schwendiman
Chris Diaz is the site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical - Okay to insulate duct work in shaft
Conference6/14/20196/14/20196/14/2019PDONE
DetailsChad Schwendiman
Consultation to discuss the fire ; smoke damper extension Phone #: ###-#### Inspection requested via web by RM Mechanical
Rough-in6/3/20196/4/20196/4/2019APART
DetailsChad Schwendiman
We would like to schedule a partial duct rough-in inspection for St. Luke''s Surgery Center. Jim Brown is the site contact ###-#### please call in advance. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical - Okay to insulate the high pressure duct
Issue PAID IN FULL permit  3/26/2019 DONE
Payment received via Govolutions
Application received  3/26/2019 DONE
This permit was created on the web by RM Mechanical