Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Brian Scoles
|
|
|
Done Phone #: ###-#### Inspection requested via web by Michael Webb- gas piping final ok
|
Pressure Test | 4/22/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Brian Scoles
|
|
|
20lb gas pass underground- ok to backfill- call in final when everything hooked up
|
Pressure Test | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | FAIL |
Brian Scoles
|
|
|
Under test Phone #: ###-#### Inspection requested via web by Michael Webb- 20lb gas test pass- need yellow tracer wire not painted- need pvc sleeves around risers if poured in concrete- piping to not be covered- one piece does not maintain 12" below grade
|
Issue PAID IN FULL permit | | | 4/19/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/19/2019 | | DONE |
|
|
|
This permit was created on the web by Michael Webb
|