Final | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brian Scoles
|
|
|
Please call Brandon @ ###-#### To Schedule this re-inspection. Thank you Phone #: ###-#### Inspection requested via web by Holly Tarvin
|
Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | P | FAIL |
Brian Scoles
|
|
|
IMPORTANT: PLEASE CALL Brandon @ Lifeways to Schedule this inspection @ ###-#### Phone #: ###-#### Inspection requested via web by Holly Tarvin- 1- need to install 4 wet switches on secondary drains on coils 2- need uv protection on all lineset outside 3- need weather tight conduit whip between disconnect and a/cs 4 locations 4- 2 a/cs at entry need right size fuses installed in disconnects
recall in when corrections fixed walked job with maintenance personell
|
Issue PAID IN FULL permit | | | 5/10/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
This permit was created on the web by Holly Tarvin
|
First Notice | 7/18/2019 | 7/18/2019 | | | |
Brian Scoles
|
|
|
|