Final | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Brian Scoles
|
|
|
Please call when you’re on your way so we can unlock the gate. Thank you. Phone #: ###-#### Inspection requested via web by Rachael Moore- final ok- will pull new mech permit for future unit heaters in back shop area- 2 flues installed on this permit clearances ok and insulation shields installed- ok to cover
|
Rough-in | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Brian Scoles
|
|
|
Mini-split rough in, dryer vent ; heater vent changes Phone #: ###-#### Inspection requested via web by Rachael Moore- R/I ok
|
Rough-in | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rachael Moore Inspection cancelled from web by: Rachael Moore
|
Rough-in | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | NR |
Brian Scoles
|
|
|
Rough in inspection for 2 bath vents and 1 dryer vent. Please call Rachael with any questions. Phone #: ###-#### Inspection requested via web by Rachael Moore- insulation shields on b vent for unit heaters needs minimum 1" clearance to combustibles- need to add air conditioning to permit for mini split- went over onsite with owner- recall in inspection when ready- 2 bath fans ok- need to fir out wall and install nail plates on dryer vent at ceiling
|
Issue PAID IN FULL permit | | | 6/11/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/11/2019 | | DONE |
|
|
|
This permit was created on the web by Rachael Moore
|