Permit Information
Permit NumberMEC19-03008
StatusFinaled
Name A-1 HEATING & AIR CONDITIONING
Site Address 1811 S OWYHEE ST
Project Name 
Customer NumberN1190703
ePlanReviewNo
Description
Complete HVAC Installation: Complete HVAC Installation. Gas PIpe to Furnace, Water Heater, Range, and Fireplace. Vent Range, Dryer, and 4 Bath Fans. N1190703
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/30/201910/2/201910/2/2019APASS
DetailsJack Reynolds
Access Instructions: On the far left house, on the backside of a pillar on the front porch, there’s a lockbox (9165), There are three keys inside; green goes to the middle house, the bare keys work on other two.
Builder Contact: Jason ###-####
HVAC Contact: Kelly ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- final ok
Final9/24/20199/27/20199/27/2019AFAIL
DetailsJack Reynolds
Builder Contact: Jason ###-####
HVAC Contact: Daniel ###-####
Access Instructions: On the far left house, on the backside of a pillar on the front porch, there’s a
lockbox (9165), There are three keys inside; green goes to the middle house, the bare keys work on other two. Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- need duct blast report onsite
Rough-in7/22/20197/23/20197/23/2019APASS
DetailsJack Reynolds
BUILDER CONTACT: JASON ###-####
HVAC CONTACT: DANIEL ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- R/I ok
Rough-in7/12/20197/19/20197/19/2019AFAIL
DetailsJack Reynolds
Builder Contact: Jason ###-####
A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- insulation sheild between 1st and 2nd floor and 1" clearances on common vent
- cover combustion air vent in floor
- line set insulation in crawl needs rips fixed and line set has a kink at a 90 degree bend
-
Pressure Test7/12/20197/19/20197/19/2019APASS
DetailsJack Reynolds
Builder Contact: Jason ###-####
A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- 20lb gas pressure test ok
- tagged meter location
Review - MECHANICAL7/15/20197/15/20197/15/2019 DONE
DetailsChad Schwendiman
Revised acca report
Issue PAID IN FULL permit  7/12/2019 DONE
Payment received via Govolutions
Application received  7/12/2019 DONE
This permit was created on the web by Arielle Hendricks