Final | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles- final ok- will sign card on other mech contractor inspection
|
Rough-in | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles
|
Pressure Test | 12/17/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- 60lb gas pass whole system
|
Rough-in | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Brian Scoles
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles- 60lb gas pass tagged meter location- still need to see lower pressure tests- need inert tape on exterior pentration by meter and concrete remove around pipe by final
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/26/2019 | | DONE |
|
|
|
This permit was created on the web by Maira Napoles
|
First Notice | 12/23/2019 | 12/23/2019 | | | |
Brian Scoles
|
|
|
|