Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Brian Scoles
|
|
|
call for access // Joe Phone #: ###-####- final ok
|
Rough-in | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####- R/I ok
|
Rough-in | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | FAIL |
Brian Scoles
|
|
|
Joe Phone #: ###-#### 1- fresh air can not come from register can route to plenum at furnace 2- insulation shield garage laying against b vent 3- secure outside air duct away from b vent in chase 2nd floor
left sticker front window
|
Pressure Test | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####- 20lb gas pass- 5lb flue pass- equipment will set on final
|
Pressure Test | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Brian Scoles
|
|
|
add rough in Phone #: ###-#### Inspection requested via web by Joe Taylor- nothing installed at this address
|
Rough-in | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Brian Scoles
|
|
|
add pressure test Phone #: ###-#### Inspection requested via web by Joe Taylor- needs complete r/i done nothing installed at this address
|
Issue PAID IN FULL permit | | | 8/8/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/8/2019 | | DONE |
|
|
|
This permit was created on the web by Joe Taylor
|