Final | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brian Scoles
|
|
|
keys are in electrical box Phone #: ###-#### Inspection requested via web by Joseph Profitt
|
Rough-in | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Brian Scoles
|
|
|
inspection is for line set and condensate drain from coil Phone #: ###-#### Inspection requested via web by Joseph Profitt- R/I ok- need to support all lineset under mobile home by final
|
Pressure Test | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Brian Scoles
|
|
|
underground gas line Phone #: ###-#### Inspection requested via web by Joseph Profitt- 20lb gas pass- underground gas piping ok to back fill- tagged meter location
|
Pressure Test | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt
|
Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt
|
Issue PAID IN FULL permit | | | 8/14/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/14/2019 | | DONE |
|
|
|
This permit was created on the web by Joseph Profitt
|