Final | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Brian Scoles
|
|
|
final - call luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- card signed- air balance for pizza oven ok however if change of occupancy occurs again, class 1 hood will have to go to original CFM quanities if cook line changes from pizza oven- Original cfm was 3500 for both class 1 hood and MAU unit
|
Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PART |
Brian Scoles
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need air balance report onsite per existing hood cfm that was emailed to Luke for exhaust and MAU- need to install 1500 degree gasket on curb- temp occupancy ok
|
Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Brian Scoles
|
|
|
cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok
|
Rough-in | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Brian Scoles
|
|
|
light test - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- light test pass- ok for 1st and 2nd layer fire wrap
|
Conference | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | DONE |
Brian Scoles
|
|
|
consult with Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- went over class 1 hood- since no labeling can be found on ul listed hood by captive aire will install to 2012 IMC-
|
Conference | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | DONE |
Chad Schwendiman
|
|
|
meet at mall- will call u in morning with time - Meet onsite to look at exhisting class 1 hood. Exhisting hood was UL listed but all the writing on the tags is gone at this point. Hood will need to meet 18" clearances per code since previous clearance information is unknown.
|
Issue PAID IN FULL permit | | | 8/15/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/15/2019 | | DONE |
|
|
|
This permit was created on the web by Brandon Sorensen
|
First Notice | 10/14/2019 | 10/14/2019 | | | |
Brian Scoles
|
|
|
|