Final | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Brian Scoles
|
|
|
Alex Phone #: ###-####- fireplace final ok
|
Rough-in | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Brian Scoles
|
|
|
Matt Phone #: ###-####
|
Rough-in | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | FAIL |
Brian Scoles
|
|
|
Rob-fireplace Phone #: ###-####- none of the corrections have been made
|
Rough-in | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Brian Scoles
|
|
|
Robert-fireplace Phone #: ###-#### 1- need to remove blue painters tape and seal firestop in approved manner- 2- need to secure plastic behind flue almost touching in places 3- need framing completed and to dimensions in installation instructions
left do not cover sticker at fireplace
|
Issue PAID IN FULL permit | | | 8/20/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/20/2019 | | DONE |
|
|
|
This permit was created on the web by Ashley Shoecraft
|