Final | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Jack Reynolds
|
|
|
Les Phone #: ###-#### - final ok
|
Final | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | FAIL |
Jack Reynolds
|
|
|
Wes Phone #: ###-#### - A/C needs locking caps - line set needs UV protection - gas line penetration needs sealed- need air balance report onsite
|
Rough-in | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Jack Reynolds
|
|
|
call if pass or fail // Dwayne Phone #: ###-#### - R/I of high pressure gas line ok secured and 3.5" above ground
|
Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Jack Reynolds
|
|
|
Dwayne Phone #: ###-#### - R/I ok
|
Pressure Test | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Jack Reynolds
|
|
|
Dwayne Phone #: ###-#### - 60lb gas pressure test ok -20lb gas pressure test ok -5lb flue pressure test ok - tagged meter location
|
Rough-in | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | FAIL |
Jack Reynolds
|
|
|
dwayne Phone #: ###-#### - 5lb flue pressure test under 5lb - nail plates for flue - need to see condensate and linset R/I
|
Pressure Test | 9/12/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brian Scoles
|
|
|
Dwayne-in ground line so they can cover Phone #: ###-####- 2 x 60lb gas pass in 2 underground locations- ok to backfill- will test whole system when gas piping is all installed- tagged one location near garage
|
Telephone call | | | 9/13/2019 | | DONE |
|
|
|
manual J submitted but was put in through the BLD19-01922 and fees were added on the building permit per Tisha
|
Application received | | | 8/27/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/27/2019 | | DONE |
|
|
|
|